Start
End
Event Type
Planned Service Interruption
Event Details
Please be advised that the subcontractor Deltro Electric is performing a full normal power shutdown lasting up to 12 hours on Thursday August 23rd that will affect Residence buildings S, R, T and Urban Ecology as follows:
1. 6 am to 10 am - Residence buildings S, R, T and Urban Ecology are all affected.
2. 10 am to 6 pm – Just Residence Building S is affected.
This work is necessary to install new electrical switch gear equipment (in Building S) for permanent power to the new parking garage, all before students move in to residence on Sunday August 26, 2018.
Add to Calendar
2018-08-23 06:00:00
2018-08-23 18:00:00
Power Shut Down Buildings S, R, T, and Urban Ecology
Please be advised that the subcontractor Deltro Electric is performing a full normal power shutdown lasting up to 12 hours on Thursday August 23rd that will affect Residence buildings S, R, T and Urban Ecology as follows:
1. 6 am to 10 am - Residence buildings S, R, T and Urban Ecology are all affected.
2. 10 am to 6 pm – Just Residence Building S is affected.
This work is necessary to install new electrical switch gear equipment (in Building S) for permanent power to the new parking garage, all before students move in to residence on Sunday August 26, 2018.
Location
Humber ITS
no-reply@humber.ca
America/Toronto
public